AC power systems and air conditioning systems are the heart of maintaining the infrastructure at Data Center. Our philosophy of testing and maintenance is based on early detection and repair any faults before they become major problems and lead to a system failure or loss of power throughout the data center. Our company understands the crucial importance of these systems is necessary to ensure the effective and efficient operation of the plant.

Very important is to make sure that the newly built data center will operate 7 days a week 24 hours a day. The key to this is to ensure optimum performance of the power supply systems and sanitation support data center.

Understanding action power, knowledge of the ways of testing and maintenance instructions of devices is the basis, which allows to provide the maximum availability of the system and the safe use of the Data Centre.

Based on tests carried out with the assistance of station loads are the basis of good practices in the field of the correct startup systems and further maintenance. Perform tests using the drive loads (load bank) allows you to verify the correctness of the implementation of the installation and to ensure its reliable operation during the failure of the main power sources and the work of the operational center.

During the test shall be verified:

  • The correctness of the design and construction of infrastructure, power and air conditioning;
  • Chamber room in accordance with the requirements of the commercial;
  • Possibility of hiring built observation area;
  • The work of individual elements;
  • The correctness of the implementation and operation of the various components of the system;
  • The effectiveness of the systems of cooling room;
  • Selective exclusion of individual systems (tune of circuit breakers);
  • Validate interoperability of systems at full load and when exceeding the rated.

In the analysis of the choice of testing the installation, consider and ask yourself questions:

  • Would I am sure my investment is properly constructed and meet expectations?
  • Do I believe that systems are working correctly and it will not be necessary to limit the possibilities of the Centre?
  • Am I sure that all purchased will work with each other in accordance with the declarations of producers?
  • Is it possible to fill the data center (Data Center) to 100% of its possibilities without failure and corresponding tests?
  • Are you ready to change and add additional equipment exceeding 50%, 60%, 70%, 80% of the load safely without the risk of uncontrolled exemptions?
  • That ensured the selectivity of exemptions and excess capacity in one rack or row does not threaten other systems?
  • Are you sure that the system has a single point of failure?
  • If your air conditioning system is powerful and has the ability to maintain appropriate environmental conditions?
  • Whether electromagnetic fields produced by 100% load does not affect other systems low-current and Telecom?

This is a good place to put the facts from recent years:

  • In the world, 90% of Datacenters is tested under the partial and full load.
  • In Poland does not apply the test under full load,90% of the Datacenters tested only under partial load.
  • Most errors in execution occurs after the imposition of the room above 80% of the power of design.

If with any question there is any doubts, this shows only and exclusively that commencing of load test is desired.

Properly performed load tests of the entire infrastructure will achieve maximum performance and justify the investment in physical infrastructure.

LoadBanks.pl company's mission is to minimize unscheduled emergency visits for equipment failure and maximize uptime of the entire infrastructure.

Since we are also designers and contractors systems data center we understand the direct problems of individual elements in the infrastructure. For our customers this represents a guarantee of services at the highest level.

In accordance with our schema operations (read here) performed the service may rely on a typical hire devices and plug them into the structure and preparation of comprehensive tests, measuring the quality of energy, thermic measuring with the presentation of a final report describing the performed tests.

Our offer is flexible and is based on the requirements of the user. We can meet any requirements and meet each of the tests proposed by the client.

For our part, we offer the typical tests for the server room:

  • test the entire infrastructure of Data Center at 100% load for 7 days
  • • test the entire infrastructure of Data Center in overload of 110% or more
  • • load tests of selected elements such as generators, UPS, STS device
  • • HVAC load tests (CRAC) in various configurations on the subject
  • exploitation load tests of UPS battery string 
  • operating load tests of generatorsh
  • load tests before operating the expansion of facilities in the target device

During the tests we offer:

  • Typical electrical measurements and verification of measurements
  • Testing infrared camera power plants
  • Power quality tests with registration relative to the switching load bank station time


If you are interested please contact us. At the meeting we will present examples of test scenarios with existing facilities and will be able to show exactly the offered services.
Obtained report contains bedside the results of the test pictures, videos with studies, including a detailed description of the work carried out and their results. 

News

Our representative at the largest FM conference in Poland.

We invite you to participate in the REM Congress, which will take place October 24-25, 2019. Real Estate Management Congress is organized by the editors of the Real Estate...

Completion of ice water rinsing service for the Data Center Warsaw facility.

We have successfully completed another order entrusted to us at the Data Center WA03 in Warsaw. This time we carried out a complicated process of chemical cleaning of...

The NASK Data Processing Center is now open.

We are proud to announce that mid-June this year. we have completed one of the stages of cooperation in the construction of the NASK Data Processing Center established in...

Show all 
The administrator of your personal data that are collected during the correspondence using the contact form is BCA Group Ltd Sp. z o.o. with its registered office in Łódź, Aleja II Armii Wojska Polskiego 3, 02–495, e-mail: biuro@bcagroup.pl, tel. +48 789 444 595. Personal data can be processed for the purposes of: performing activities before the conclusion of a contract or contract performance, presentation of a commercial offer, answering your questions – depending on the content of your message. The basis for the processing of personal data is Article 6 para. 1 letter b of the Regulation of the European Parliament and the Council (EU) 2016/679 of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free flow of such data (GDPR), i.e. the performance of a contract or taking action before the conclusion of a contract, Article 6, para. 1 letter a RODO, i.e. your consent, article 6 para. 1 letter f, i.e. the legitimate interest of the administrator - willingness to answer your questions and doubts. Personal data will be processed for the period that is necessary to achieve the purpose of processing, i.e. to conclude a contract, present a commercial offer, answer your questions or concerns, and may be stored until the end of the contract period and the limitation of claims under the contract. The person whose personal data are processed has the right to access, rectify, delete, limit processing, object to the processing and the right to transfer personal data, provided that the right to transfer personal data only applies to data processed in an automated manner. A person whose personal data are processed on the basis of consent has the right to revoke it at any time, without prejudice to the processing of personal data prior to the withdrawal of consent. The person whose personal data are processed has the right to file a complaint to the competent supervisory authority. Providing personal data is voluntary, but failure to provide them will result in the inability to perform a contract, take action before entering into a contract, present a commercial offer, answer questions or concerns.
Ask a question